钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News >
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn
Discussion on sustainable development of steel companies
    In China, in addition to the steel company in Dongguan, there are many family steel company, that add up to tens of thousands of large and small, and have a certain size and strength should also have a hundred.    &...
2016/8/20
How the design of steel structures engineering judgment?
Macau during our steel structures when to first pay attention to a premise that how to determine the steel structure design project. So how should we Macao steel judged it? Many people may think it is not what gage and tool? No, it is not required, ...
2016/8/17
Advantage Steel Buildings
    Shenzhen steel construction in recent years has been more and more development, especially in China, the development of iron and steel, but a few decades, but it is the use of steel has been greatly developed, and gradually apply u...
2016/8/13
Ministry of Transport stated, vigorously promote the construction of steel bridges
    Foshan Steel gives news, No. 1, the Ministry of Transport issued "Guiding Opinions on Promoting the Construction of Steel Bridge Road" and building the whole "Thirteen Five" in the planning and construction Finally, to develop and ...
2016/8/10
"Tianmu Tower" successfully capped, another steel structure project shines
...
2016/8/3
Housing material Steel and Its Superiority
Housing material Steel and Its Superiority China's land resources dwindling, the future of daily living with a house to the field of steel Foshan is the trend, but also the technology and human civilization into generation flag. For ordinary people ...
2016/6/11
Foshan three steel steel truss construction method
A high-altitude assembly methodSteel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were ...
2016/6/11
The disadvantage of Dongguan steel housing
Dongguan steel housing disadvantages:1. cost than traditional brick and concrete and steel mixed with relatively higher.2. The light steel structure house with its unique steel skeleton and walls, roofing and other materials as well as standardizatio...
2016/6/1
Dongguan, a little steel housing
Dongguan steel housing refers to the load-bearing beams of steel as a building of residential buildings, according to the height can be divided into low-rise and high-rise steel structure residential steel housing, low-rise steel residential light st...
2016/6/1
Question how to apply quota and the preparation of accounting should be aware of
Question how to apply quota and the preparation of accounting should be aware of    Foshan Steel more convenient when you want to make things right after drawing input electronic document to facilitate future search and accounting. To...
2016/5/28
Foshan Steel budget should be done before some of the knowledge necessary
Foshan Steel budget should do before some of the knowledge necessary (1) To know Foshan steel construction technology, specifically how each process is picking, how cutting, how construction, so you can make the calculation does not reveal the amoun...
2016/5/28
Construction and installation of steel structures virtual simulation process (Figure)
Construction and installation of steel canopy virtual simulation processes (renderings)1, 120 tons crawler crane platform canopy will complete the installation of steel columns2, the erection of the support frame, lifting the first string truss Pin3,...
2016/5/18
page:12  1  2  3  4  5  6  7  8  9  10  11  12  13  14  15  16  17  18  19  20  21  22  23  24  25  26  27  28  29  30  31  32  33  34  35  36  37  38  39  40  41  42  43  44  45  46  47  pervious next  

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
纳米分散| 水质分析仪| 气环式鼓风机| 山东环氧地坪| 氨水在线浓度分析仪| 自动化编程| 简支梁摆锤冲击试验机| 压铸机| 不锈钢搅拌罐厂家| 沥青加温罐| 台湾卧式车床| 水质toc分析仪| CNC精密立式车床| tek经销商| 保税区围网| 磨床粉尘收集吸尘机| 程序降温仪补液罐| 在线式氦气纯度检测仪| 绝缘纸板| 油脂烟点测定仪| 重庆市沃利克环保设备| 纯电动装载机| 耐磨钢| 德国锐肯尼克Reckonic编码器| 能源钢铝拖链| 能见度传感器| 高低温试验箱| 三相微机继电保护测试仪| 川仪PDS| 多功能辐射监测仪| 多探头便携式水质参数仪| 超低温液氮深冷箱| 莱玻特瑞霉菌培养箱| 夹心米饼生产线| abmgood培养| 硅胶管| LUBRICANT润滑剂| 租用机械式立体停车位| 编码器| ZJS智能振动摆度监测仪| 二手储运设备罐体提取罐|