钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > FAQs
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn
Why timing roofing needs maintenance?
Why timing roofing needs maintenance? WHY why maintenance roofing needs timing? Foshan Steel Experience tells us: roofing needs 5-8 years to conduct a systematic overall view, maintenance or refurbishment intervals, this can effectively prevent damag...
2014/9/6
Prestressing steel reinforcement program
Prestressing steel reinforcement program [Problem] prestressed reinforcement steel student program? [Answer] prestressing steel reinforcement and construction technology program: Prestressing steel reinforcement program can be divided into two type...
2014/9/3
Multi-storey and high-rise steel column base grouting requirements
Multi-storey and high-rise steel column base grouting requirements [Student] multi doubt rise steel column base grouting and regulations? [Answer] In the first section of the frame after installation, calibration, bolt, that should be the bottom en...
2014/8/27
Steel construction?
Steel construction? 1, Foshan Steel system has a light weight, easy installation, short construction period, good seismic performance, contribution to recover faster, less environmental pollution and other comprehensive advantages, good ductility and...
2014/8/20
Features built steel structure analysis?
Features built steel structure analysis? Steel structure engineering technology uses Foshan Steel Works mainly in steel production, steel beams, steel columns, steel trusses and other components made ​​from steel and steel plate compositi...
2014/8/20
What are the characteristics of steel plant, composed of?
What are the characteristics of the steel structure plant, constitute? Foshan Steel plant refers to the use of steel and hot rolled, cold-formed or welded profiles made ​​by the convergence of convergence and transmission parts can with...
2014/8/20
FAQ steel welding process
FAQ steel welding disposal (B) the cold crack Generally refers to weld cold cracking during cooling down to the temperature changes in the temperature of martensite size (300-200 ℃ below) occurs, can be presented immediately after welding, and can ...
2014/8/16
Steel manufacture related test requirements?
Steel manufacture about experimental requirements? (1) Steel reinspection When the steel is one of the following conditions should be expected before processing the next reinspection: ① foreign steel imports; ② mixing different batches of steel ③ the...
2014/7/30
Control purposes tall buildings?
Control of high-rise building construction intentions? Foshan multi-layered steel high-rise buildings, the height of the large, high-rise buildings constructed in order to ensure the necessary rigidity Foshan Steel respond layer between the maximum d...
2014/7/26
The advantages and disadvantages of building steel plant?
Advantages and disadvantages of steel construction plant? Foshan Steel Advantages 1, widely use: apply to factories, warehouses, office buildings, stadiums, hangars and more. Both for single-large-span construction, can also be used to create a multi...
2014/7/26
Steel plant routine maintenance and upkeep of the building?
Construction of steel plant routine maintenance and conservation? 1, after we Foshan Steel plant installed on the owners concerned, can not be allowed to modify its structure, can not remove any of the bolts and other components, can not increase or ...
2014/7/26
Steel plant routine maintenance and upkeep of the building?
Construction of steel plant routine maintenance and conservation? 1, after we Foshan Steel plant installed on the owners concerned, can not be allowed to modify its structure, can not remove any of the bolts and other components, can not increase or ...
2014/7/19
page:13  1  2  3  4  5  6  7  8  9  10  11  12  13  14  pervious next  

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
仿形修角机| 智能人工气候培养箱| 磁力反应釜| 山东临工装载机配件厂家| 不锈钢磁力泵| ebmpapst进口风机| 部分回转| marposs定制检具| 租赁开闭所| 粉尘防爆鼓风机| 纤维打包带机器| 智能化辐射仪| 地下管网水质水文监测站| VOC在线监测管理系统| 硅橡胶条| 陶瓷砂轮| 凝点倾点测定仪| 机械刀片| 工地环境扬尘实时监测设备| 液相色谱仪梯度系统| 原料桶加热融化烘箱| 无尘布| 快速温变试验箱| 串联谐振耐压机| 广东调节阀| 细胞单轴应力加载| 液压开孔器| 往复式气浴恒温振荡器| 汽车座椅安全带固定点强度试验台| 中国机械通用零部件工业协会| PRElectronics变送器| 测距望远镜| WOERNER分配器| MPP顶管挤出机| 数控机械内拉床| 进口VOC检测仪| 叠加式振荡培养箱| 糖浆灌装生产线| 土工膜| 液化气分析专用色谱| 雷达水位计|