钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > Multi-storey and high-rise steel column base grouting requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

Multi-storey and high-rise steel column base grouting requirements

Time:[2014-8-27]  Hits:4565

Multi-storey and high-rise steel column base grouting requirements

[Student] multi doubt rise steel column base grouting and regulations?
[Answer] In the first section of the frame after installation, calibration, bolt, that should be the bottom end of the steel column column grouting, grouting way is to stand around in the column foot template, based on a clean surface to clear, and then polymerized with high strength mortar poured from the Liberal side to dense, after filling with wet straw bags or sacks conservation.
Above all finishing work according to the participants encountered in actual questions from, for reference, if in doubt please timely communication, correct me. Foshan Steel

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
MT8870A| 浮游生物智能鉴定计数系统| 电磁超声腐蚀测厚仪| 橡胶拉力机| 微波水热平行合成仪| KAIJO凯捷| 真空滤油机| 10吨塑料防腐储罐| 频率读数仪| LUBRICANT润滑剂| 石油套管| 综掘机租赁| 臭氧发生器厂家| KOHKI油压快换接头| 螺杆真空泵| 观光车电机| 研华嵌入式工控机| 电动装载机品牌| 美国2B臭氧检测仪| 4300系列压力传感器| 五轴数控磨床| 潍坊通风柜| SICK传感器| 热膜风速变送器| 电磁辐射检测| 水质细菌检测| 电脑自动端子机| 螺旋输送机图纸方案| 电解水氢气发生器| 工业服务器| 椰子粉碎机| 保定| Pharmed管| 粉体输送设备| 溜槽堵塞检测器| 埃福创AVTRON编码器| 石墨烯板框过滤器| 厂家| 防爆灭蚊灯| 锂电池露点变送器| MT2系列振动速度传感器|