Zhuhai stone factory

Zhuhai stone factory

Zhuhai Quarry Workshop
Project Description
Guangdong Changheng Group occupies an area of 600000 squire meters,
Measures to prevent dust generated by crushing stones is using the closed steel structure workshop made by Foshan Sheng Bang Steel Structure Co.,(for short “SBS”). The gravel is mainly used for the processing of base-level bedding, highway engineering, airport reclamation and so on. The breaking production line is the leading technology in China with high productivity and high efficiency. The crushing site is close to the dock and the aggregate can be transported by a two-kilometer large conveyor belt to the transport ship.

Project Prominent point
With prefabricated steel structures, high-efficiency deep pre-fabrication is carried out in advance by SBS, which greatly increases construction efficiency and saves twice the time of traditional concrete or steel construction on site. Because it is crushed aggregates, dust is very diffuse, in order to achieve the effect of green mining. SBS seals the production line of the crushing yard, and cooperates with dust-collecting environmental protection equipment, spray atomization and other dust prevention measures. The workshop is completely closed, which is beneficial to the production without weather, but also provides workers with a good working environment, greatly mobilizes workers' enthusiasm for production, and promotes production efficiency. As the crushing equipment needs to periodically replace the crusher's dental plate and vibrating screen, the factory is equipped with a 25-ton crane and can go through every lifting position. It can be produced or overhauled without fear of wind and rain in a closed workshop.
In the Zhuhai Quarry Steel Structure Workshop project undertaken by SBS prefabricated steel structure deep prefabrication construction technology is applied to the prefabrication of steel structures such as pipe frames and equipment platforms. Designed through 3D professional modeling, detailed to the connection position and bolt arrangement. The professional design team conducted a detailed technical investigation, eliminated the difficulties of prefabricated steel structures, multiple nodes, high design requirements, and short installation time, and completed efficiently all production difficulties. The prefabricated depth of all steel structures reaches 98%, and the tolerances of the axis lines, elevations, and joint positions of the system's pipe racks are controlled within 2mm, and there are no reworks beyond the millenium pipe racks. The hole position, aperture, quantity, etc. of several million bolts are matched with the field installation with no mistake.

Project achievement
1.Green and closed mining
The traditional mining work is generally open-pit mining. Due to the relatively large environmental pollution caused by aggregate crushing and screening dust, closed mining significantly reduces the environmental pollution caused by mining. In response to President Xi Jinping’s call to “Lucid waters and lush mountains are invaluable assets.”, the project was conducted by the design team of SBS on site and the technicians used a three-dimensional approach. Software modeling, detailed node construction, simulation of on-site assembly effects, and solving the problem of closed mining restricted by space.

2.Steel structure workshop: weatherproof, anti-vibration, closed production, prevent dust
The overall design of the steel structure is particularly critical for the entire building. The design team of SBS first designs the floor plan using CAD software in Zhuhai quarry workshop, then uses 3D software to model it, and the data is then modeled by the chief engineer. Analyze and contrast, design the scheme that suits the actual demand of the workshop most, make the steel structure workshop reach weatherproof, anti-vibration, closed production, prevent dust
After designing and testing, in the case that the weight of the building is only one-fifth of the brick-concrete structure, it can withstand winds of 200 kilometers per hour and heavy rainstorms with a total of 12 hours of total rainfall of 100 millimeters. Zhuhai Quarry Steel Structure Workshop The seismic intensity is as high as 10, so that the life and property can be effectively protected, and the workshop production is not affected by the harsh environment. Compared to the traditional open-pit mining, the Zhuhai quarry steel structure workshop can provide a good environment for the production work. Closed-in production also has a powerful role in promoting the harmonious development of the ecological environment and the secondary use of waste resources. Closed production can effectively prevent the spread of dust, combined with core technologies such as biological nanofilm dust suppression technology, cloud dust suppression technology, and wet dust collection technology, to collect and process dust, and achieve low cost and high efficiency to reduce the pollution caused by mining work to the atmosphere.
With the concept of environmental protection and the sustainable development has become more and more in-depth, and the demand for low-cost and high-efficiency has become increasingly high in practical work. Steel structure construction causes little pollution during construction, and it is easy to install and disassemble, and can be 100% The advantages of recycling have also become more prominent. As an outstanding enterprise in the industry, SBS will continue to update and optimize itself, improve its own professional and technical level, fully grasp the production and installation technology of steel structures, strengthen the control of steel structure production and installation quality, ensure the safety and quality of construction projects are good.

Zhuhai quarry steel structure design drawings and installation drawings are as follows

设计图.png

Quarry workshop steel column installation

With the concept of environmental protection and the sustainable development has become more and more in-depth, and the demand for low-cost and high-efficiency has become increasingly high in practical work. Steel structure construction causes little pollution during construction, and it is easy to install and disassemble, and can be 100% The advantages of recycling have also become more prominent. As an outstanding enterprise in the industry, SBS will continue to update and optimize itself, improve its own professional and technical level, fully grasp the production and installation technology of steel structures, strengthen the control of steel structure production and installation quality, ensure the safety and quality of construction projects are good.

未命名1.png

Quarry workshop steel beam installation

---2

Quarry workshop wall installation

After designing and testing, in the case that the weight of the building is only one-fifth of the brick-concrete structure, it can withstand winds of 200 kilometers per hour and heavy rainstorms with a total of 12 hours of total rainfall of 100 millimeters. Zhuhai Quarry Steel Structure Workshop The seismic intensity is as high as 10, so that the life and property can be effectively protected, and the workshop production is not affected by the harsh environment. Compared to the traditional open-pit mining, the Zhuhai quarry steel structure workshop can provide a good environment for the production work. Closed-in production also has a powerful role in promoting the harmonious development of the ecological environment and the secondary use of waste resources. Closed production can effectively prevent the spread of dust, combined with core technologies such as biological nanofilm dust suppression technology, cloud dust suppression technology, and wet dust collection technology, to collect and process dust, and achieve low cost and high efficiency to reduce the pollution caused by mining work to the atmosphere.

---3

Zhuhai steel structure quarrying workshop - multiple transmission belts

20180522101628_8354294


 

 

Hits:11944 Time:[2020-9-5]

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
爱知工程机械| 中央供料系统| 压力变送器| 半径生长测量仪| REER| 超低频交流耐压装置| 快装透明软连接| 海南在线监测| 一体化净水器| 电动装载机品牌| 三洋药品冷藏箱| 辐射检测仪| PVMQ低温橡胶| 叠瓦电池片拉力试验机| 活化素Aelisa| 水性哑光树脂| 紫外荧光测硫试验器| 蛙人水下管道封堵| 非甲烷总烃检测气相色谱| 非甲烷总烃气相色谱仪| 2吨拉力计价格| 多年热熔钻设备研发制造经验| 气相色谱仪(热解析\环境残留溶剂检测\国产)| 一体化涡街流量计| 牧草种子清选设备| 水平垂直燃烧试验仪| 电动执行器阀门| 不锈钢焊接叶轮| 单人超净工作台| 天宝TrimbleGPS手持机| 旋转式| 烧机房| 电磁式隔膜空气泵| 打磨机专用除尘器| 自动化高速点胶机| 意大利FINMOTOR滤波器| 食品检测设备厂家价格| 临沂激光切割| 派克先导式电磁阀| 省煤器生产厂家| 重庆春风机电|