Zhuhai stone factory

Zhuhai stone factory

Zhuhai Quarry Workshop
Project Description
Guangdong Changheng Group occupies an area of 600000 squire meters,
Measures to prevent dust generated by crushing stones is using the closed steel structure workshop made by Foshan Sheng Bang Steel Structure Co.,(for short “SBS”). The gravel is mainly used for the processing of base-level bedding, highway engineering, airport reclamation and so on. The breaking production line is the leading technology in China with high productivity and high efficiency. The crushing site is close to the dock and the aggregate can be transported by a two-kilometer large conveyor belt to the transport ship.

Project Prominent point
With prefabricated steel structures, high-efficiency deep pre-fabrication is carried out in advance by SBS, which greatly increases construction efficiency and saves twice the time of traditional concrete or steel construction on site. Because it is crushed aggregates, dust is very diffuse, in order to achieve the effect of green mining. SBS seals the production line of the crushing yard, and cooperates with dust-collecting environmental protection equipment, spray atomization and other dust prevention measures. The workshop is completely closed, which is beneficial to the production without weather, but also provides workers with a good working environment, greatly mobilizes workers' enthusiasm for production, and promotes production efficiency. As the crushing equipment needs to periodically replace the crusher's dental plate and vibrating screen, the factory is equipped with a 25-ton crane and can go through every lifting position. It can be produced or overhauled without fear of wind and rain in a closed workshop.
In the Zhuhai Quarry Steel Structure Workshop project undertaken by SBS prefabricated steel structure deep prefabrication construction technology is applied to the prefabrication of steel structures such as pipe frames and equipment platforms. Designed through 3D professional modeling, detailed to the connection position and bolt arrangement. The professional design team conducted a detailed technical investigation, eliminated the difficulties of prefabricated steel structures, multiple nodes, high design requirements, and short installation time, and completed efficiently all production difficulties. The prefabricated depth of all steel structures reaches 98%, and the tolerances of the axis lines, elevations, and joint positions of the system's pipe racks are controlled within 2mm, and there are no reworks beyond the millenium pipe racks. The hole position, aperture, quantity, etc. of several million bolts are matched with the field installation with no mistake.

Project achievement
1.Green and closed mining
The traditional mining work is generally open-pit mining. Due to the relatively large environmental pollution caused by aggregate crushing and screening dust, closed mining significantly reduces the environmental pollution caused by mining. In response to President Xi Jinping’s call to “Lucid waters and lush mountains are invaluable assets.”, the project was conducted by the design team of SBS on site and the technicians used a three-dimensional approach. Software modeling, detailed node construction, simulation of on-site assembly effects, and solving the problem of closed mining restricted by space.

2.Steel structure workshop: weatherproof, anti-vibration, closed production, prevent dust
The overall design of the steel structure is particularly critical for the entire building. The design team of SBS first designs the floor plan using CAD software in Zhuhai quarry workshop, then uses 3D software to model it, and the data is then modeled by the chief engineer. Analyze and contrast, design the scheme that suits the actual demand of the workshop most, make the steel structure workshop reach weatherproof, anti-vibration, closed production, prevent dust
After designing and testing, in the case that the weight of the building is only one-fifth of the brick-concrete structure, it can withstand winds of 200 kilometers per hour and heavy rainstorms with a total of 12 hours of total rainfall of 100 millimeters. Zhuhai Quarry Steel Structure Workshop The seismic intensity is as high as 10, so that the life and property can be effectively protected, and the workshop production is not affected by the harsh environment. Compared to the traditional open-pit mining, the Zhuhai quarry steel structure workshop can provide a good environment for the production work. Closed-in production also has a powerful role in promoting the harmonious development of the ecological environment and the secondary use of waste resources. Closed production can effectively prevent the spread of dust, combined with core technologies such as biological nanofilm dust suppression technology, cloud dust suppression technology, and wet dust collection technology, to collect and process dust, and achieve low cost and high efficiency to reduce the pollution caused by mining work to the atmosphere.
With the concept of environmental protection and the sustainable development has become more and more in-depth, and the demand for low-cost and high-efficiency has become increasingly high in practical work. Steel structure construction causes little pollution during construction, and it is easy to install and disassemble, and can be 100% The advantages of recycling have also become more prominent. As an outstanding enterprise in the industry, SBS will continue to update and optimize itself, improve its own professional and technical level, fully grasp the production and installation technology of steel structures, strengthen the control of steel structure production and installation quality, ensure the safety and quality of construction projects are good.

Zhuhai quarry steel structure design drawings and installation drawings are as follows

设计图.png

Quarry workshop steel column installation

With the concept of environmental protection and the sustainable development has become more and more in-depth, and the demand for low-cost and high-efficiency has become increasingly high in practical work. Steel structure construction causes little pollution during construction, and it is easy to install and disassemble, and can be 100% The advantages of recycling have also become more prominent. As an outstanding enterprise in the industry, SBS will continue to update and optimize itself, improve its own professional and technical level, fully grasp the production and installation technology of steel structures, strengthen the control of steel structure production and installation quality, ensure the safety and quality of construction projects are good.

未命名1.png

Quarry workshop steel beam installation

---2

Quarry workshop wall installation

After designing and testing, in the case that the weight of the building is only one-fifth of the brick-concrete structure, it can withstand winds of 200 kilometers per hour and heavy rainstorms with a total of 12 hours of total rainfall of 100 millimeters. Zhuhai Quarry Steel Structure Workshop The seismic intensity is as high as 10, so that the life and property can be effectively protected, and the workshop production is not affected by the harsh environment. Compared to the traditional open-pit mining, the Zhuhai quarry steel structure workshop can provide a good environment for the production work. Closed-in production also has a powerful role in promoting the harmonious development of the ecological environment and the secondary use of waste resources. Closed production can effectively prevent the spread of dust, combined with core technologies such as biological nanofilm dust suppression technology, cloud dust suppression technology, and wet dust collection technology, to collect and process dust, and achieve low cost and high efficiency to reduce the pollution caused by mining work to the atmosphere.

---3

Zhuhai steel structure quarrying workshop - multiple transmission belts

20180522101628_8354294


 

 

Hits:11945 Time:[2020-9-5]

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
罗茨螺杆泵真空机组| 山东不锈钢玻璃门| 方形铸铁镶铜闸门| DYNEX二极管| 一氧化碳传感器| 土壤XRF荧光光谱仪| Tyler泰勒筛| 原料桶加热融化烘箱| H型可换膜| 河北变频器维修| FAGOR光栅尺维修| PAM表面污染测量仪| 工业在线浊度仪| 非接触光学表面测量| 超大玻璃厂家| 断链保护器| ZNCL磁力搅拌加热锅| BTL位移传感器| 气体增压泵| 圆形真空干燥箱| 恒温恒湿空调机| 斜齿数控车床| 短路接地线| 纯水电导率检测仪| ISOLOC备件| 五轴联动桥式龙门加工中心| 扭力扳手| 铝合金破碎机| 手动型高强螺栓检测仪| 多介质过滤器| 园林直饮水机| 非金属膨胀节| 不锈钢翅片管生产厂家| 进口| 进口载玻片| 电力物联网仪表| TPK快克无铅焊台| 金相试样磨抛机| 广州南洋电缆| 组培专用光谱灯| 精萘厂家|