钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > What should be done before installing the steel structure grid?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

What should be done before installing the steel structure grid?

Time:[2021-11-20]  Hits:1944

What should be done before installing the steel structure grid?

The installation of steel structure grid is relatively different from the construction of traditional buildings. The installation of steel structure grid has high technical requirements for constructors, so preparations should be made before construction. The following small series will specifically introduce what work should be done before installing the steel structure grid.

First of all, as a professional steel structure grid construction company, each construction team should have a series of construction processes and some relevant regulations, that is, whether before or during construction, it should have a perfect system to ensure that each step can be carried out smoothly, It also ensures that each step of inspection can be implemented. Generally, before the construction of steel structure, there will be professional teams and personnel to design the drawings. After the drawings are designed, there will be a number of professionals to discuss and conduct simple experiments on some questions arising from the drawings. Then, after the drawings are basically determined, the raw materials can be purchased. At this time, the raw materials should be strictly compared with the drawings to ensure that the structural size and material of any part are purchased accurately according to the drawings. Of course, in addition to the raw materials needed in some buildings, the auxiliary supplies and tools needed in some buildings also need to be compared and checked one by one.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
AGV用减速机| 仪器箱| 无机涂料厂家【可自由调色】| 玻璃瓶啤酒灌装线| 隔爆双金属温度计| EPK测厚仪| 滤器滤膜| TDR测试| 水稳拌和站| 多工位电池片焊带拉力计| SZCL磁力搅拌加热套| CK6140数控车床厂家| 佛山加固施工| 地埋式积水监测预警系统| 邮箱用户登录| 白酒气相色谱仪| 机床油雾回收器| 高低温箱厂家| 油麦氏真空计| 河南锦滤工业科技| 一体化振动变送器| 冷藏集装箱| 多介质过滤器厂家| RFU检测| 滚筒式电子秤| 伺服驱动器维修| 轴流式屋顶风机| 带钢冲孔机| 倍加福电感式传感器| 危废暂存间| 钠离子测量仪| 地下管网水质水文监测站| 基恩士显微| 日本新宇宙气味检测仪| OLI气动振动器| 网站制作| 普罗名特计量泵| HYDAC贺德克压力传感器| 阻燃缠绕管| 上海去离子水设备| 美国ASCO电磁阀|