Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:1942

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
纸绳手挽厂家| 空气振动器| 电流探头厂家| 空气品质分析仪| 差压变送器| 石油产品色度试验器| 消防安装施工| INA导轨| EHS安全体验馆| tek生物镊子| 箱式污泥采样器| 9130原子荧光光度计| 医院透析室轮椅秤| 山东实验台厂家| 省力加力扳手| 食品拍打式无菌均质器| 烟气治理脱硫脱硝| ND钢管| 消防车辆维保| ZW32| 溶出取样器| 无损探伤设备网| 容积式换热器| 一体化紫外线消毒设备| 新能源电缆设备| 振动分析仪| 酸碱浓度计传感器| 有源电力滤波柜| 管道漏水检测仪| 赛斯特冷冻系统| 防爆对射探测器| 防静电台垫| TREK520| ADFweb网关| CINCON电源| 平板导热仪| 溶剂蓝| 四眼鞋| 上海柴油机| 皮革动态防水试验机| 常州市国立试验设备研究所|