Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2006

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
球磨机选矿球磨机棒磨机浮选机分级机选矿设备厂家| 全自动抗干扰介损测试仪| 阀门试验台| 色差仪| 冷弯型钢| 电接点耐震压力表| 吸粪车| 成缆机| 氧化沟潜水推流器| 蓄热式催化燃烧设备| 工业内窥镜| 辐射监测仪| 上海自仪四厂| Chroma滤光片| 山东微型| 塑料熔指仪| 拖车式柴油机矿用泵| 土工膜厚度仪| 紫外制冷光谱仪| 煤炭氟氯测定仪| 摩铎利铝合金电机| Model400动态发色| 气相玻璃填充柱| 敏泰风电滤芯| 中药提取设备厂家| 全自动| 御健电疗机| 水质在线溶解固体TDS分析仪| leser莱斯| 山东减速机| 白介素8试剂盒| 航空箱| 二维条码检测仪| 小型单相高压风机| 氧化沟推流器玻璃钢叶轮| 爱知工程机械| 6位移变送器| DF| 电磁离合器制动器组| 油冷式电动滚筒| 石油产品测定仪厂家|