钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2335

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
电厂板框除尘滤板| 多轴钻床| 油箱| 锯末| CCC认证咨询| HDPE土工膜| 调节池框式搅拌机| 汽油机驱动高压水枪| 常规五参数水质监测仪| 环氧玻璃丝管| 台湾二手仪器| 人登革病毒IgG抗体检测试剂盒| 上海伊顿UPS电源| 海尔生物医疗四川代理商| 中压鼓风机透浦式| 出租箱式变电站| 盐雾试验机| 睿博联仪器设备| 永磁除铁器| 无轨平车生产厂家| 深圳高品质电源适配器| 二手ICP等离子发射光谱仪| QW潜水无堵塞排污泵| HTD| HAST高压加速寿命老化试验箱| 浇钢砖| 金相显微镜| 粉末材料电阻率测试仪| 赛默飞粘度计| 固定污染源连续监测系统| 空气放射性监测仪| 体系认证咨询| 皮革摩擦色牢度试验机| 旋涡式| MDR2000无转子硫化仪| 美国Autolite火花塞| inertsustain色谱柱| 快递自动称重系统| 门锁弹簧| CBS程序降温仪| 纸巾柔软度测定仪|