Requirements of steel structure building for foundation

Time:[2021-7-17]  Hits:2131

Requirements of steel structure building for foundation

The requirement of steel structure building for foundation is much lower than that of traditional concrete. What are the requirements of steel structure building for foundation.

The foundation selection of steel structure building is focused on its bearing layer, especially for some higher steel structure buildings, the foundation slab or pile end should go deep into the bearing layer. Therefore, the foundation of the same structural unit can not use both natural foundation and artificial foundation, and can not use two or more types of soil layers with large property differences as the foundation. Sometimes, in order to prevent the uneven settlement of the ground, the foundation will be deepened or the pile length will be increased.

Steel structure building, especially light steel building, can not be affected by any geological environment, whether it is wetland or arid area, can achieve the optimal construction conditions through construction, but also can save the construction period. Because of the superior seismic performance of steel structure buildings, we can see many steel structure buildings in some areas with high earthquake incidence. The whole installation process is convenient and the protection effect is good, but we need to take some targeted foundation stability measures and strengthen the integrity of the foundation. There may be liquefiable soil layer in the range of foundation bearing stratum in earthquake prone area, so some measures must be taken to eliminate the adverse effect of soil liquefaction on superstructure.

The following measures can be taken to eliminate the adverse effects of foundation soil liquefaction settlement on steel structure buildings

1. If pile foundation is used in steel structure building, the length of pile end extending into the stable soil layer below the liquefaction depth shall be determined according to the bearing capacity of pile, and all liquefiable soil layers within the foundation bearing layer shall be excavated.

2. Densification method can be used to eliminate the adverse effects of soil liquefaction, such as sand pile compaction method, dynamic compaction method, vibroflotation method, etc., so as to ensure the treatment to the lower interface of soil liquefaction depth.

Steel structure building can overcome all kinds of geological environment and ensure its superior performance of wind and earthquake resistance.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
带电氧化锌避雷器测试仪| 液压万能试验机| Benchmark均质器| 输电线路在线监测| 真空吸污车| 水流开关传感器| 医用品包装机| 卫生级呼吸器| 贴片可控硅| ECOM紫外检测器DAD400| 防震投光灯| 氢氧化铝厂家| 原位拉伸台| 高定向热解石墨HOPG| 药品强光照射试验箱| 双五点热封梯度仪| 无线计量电表| 不锈钢焊接叶轮| 东莞端子线定制| 摩擦系数测试仪| 3751灭菌器| M1200d多波束前视声呐| 折叠身高体重秤| kubler增量编码器| 粪污养分检测仪| 等度高效液相色谱仪| 塑料低温脆性| PD046| 光电开关传感器| 100A回路电阻测试仪| 数字压力传感器| 恒温水槽与水浴锅| 德国进口空气能热泵「商用地暖空调一体机取暖工程」| 伸缩器| 现场总线网关| 蓝牙双模| 腾氏高压灭菌器| 轻质防爆墙施工安装| 停车场收费系统| 混斜流通风机| 自动售酒机|