How to control the construction quality of steel structure engineering

Time:[2020-12-2]  Hits:3143

Make preparations before the project starts

 

Strengthen the review of construction drawings. The drawings are the basis for the construction of the project. Before the start of the project, the project control agency should organize the control personnel to be familiar with the specifications and technical conditions related to the project drawings and the project, and fully understand the design intent.

 

 

Carefully review the steel structure installation and construction organization design. The construction organization design is a technical document for the construction unit to comprehensively guide the implementation of the project. The completeness of the construction organization design directly affects the quality and progress of the project. Therefore, the design review of the construction organization of the steel structure installation project should be targeted and focused.

 

 

Strengthen quality control during on-site construction

 

Do a good job in quality control of steel structure foundation projects. The foundation of steel structure engineering generally adopts concrete independent column foundation. The construction of foundation concrete, steel bar, and formwork are the same as other engineering construction procedures and methods. The embedded bolts in the foundation independent column are the focus of quality control. The spacing and height deviation between each set of bolts directly affect the installation quality of the steel structure project. We require the construction unit to strictly control the quality control process.

 

 

Quality Control of Main Steel Structure Project

 

Quality control of steel component installation. When installing columns and beams, mainly check whether the shim under the column bottom plate is firm and level, whether the column is vertical and displaced, the beam is vertical, straight, laterally bent, bolt tightening degree, and friction surface cleaning. After acceptance, Before lifting. When the steel structure is installed to form a space fixed unit and passed the acceptance inspection, the construction unit is required to compact the space between the column bottom plate and the top surface of the foundation with expanded concrete.

 

 

Control of bolt installation quality. In steel structure engineering, high-strength bolts and ordinary bolts are generally used for bolt connection. Ordinary bolts are connected. One end of each bolt shall not be filled with more than 2 gaskets. The bolt holes shall not be reamed by gas cutting. After the bolts are tightened, the exposed threads shall not be less than 2 pitches; Before using high-strength bolts, we check the certificate and retest form of the bolts. During the installation process, the contact surface of the board stack should be flat, the contact surface must be greater than 75%, and the edge gap should not be greater than 0.8mm. The high-strength bolts should be inserted freely, and no knocking or reaming is allowed.

 

 

In the process of steel structure engineering construction control, it is necessary to truly play the role of engineering control. It is required that the progress of the project must be strictly controlled during construction. At the same time, engineers must do a good job in quality control. Ensure the construction quality of steel structure projects.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
十八烷基伯胺| 成都洁净棚| 电缆故障测试仪[精准定位]| 一次性预灌装表面接触碟| 冷库工程| 绕包机| 交通仿真实验室| 温室育苗喷灌机| 自动抛丸机生产| 氮化镓充电器生产厂家| 施工升降机| 日本AND水份仪维修| 全自动外圆磨床| 大型旋蒸生产厂家| kracht溢流阀| 贺利氏锌液定铝仪| 管壳式换热器| 六杯型绝缘油介电强度测试仪| 磁力高压反应釜| Magnescale测厚仪| 斗式提升机厂家| 供水标识桩| 二氧化碳高压泵| 氧化锆探头| 中高压空压机| 张家港电子秤| 双波段闪烁仪| 无管道净气型试剂柜| ODM蠕动泵| ZTF智能温控轴流风机| I型胶原N末端肽试剂盒| 中心回转抓岩机| 混凝土快速冻融试验机| 老化黄度试验箱| 中国机械通用零部件工业协会| 西门康IGBT模块| 爱知工程机械| KEYENCE基恩士| 兔抗鼠抗体| 格栅板| 阻燃缠绕管|