Project cost control for wholesale metal building systems

Time:[2020-10-24]  Hits:2879

Different structural systems, peace, and facade layout have obvious effects on the project cost. In the design stage, only by determining the reasonable layout and facade layout and structural system according to the functional requirements of the building can the project cost be effectively controlled and economically applicable.

 

 

The design of the steel structure of the portal frame steel structure also has the economic span and the optimal spacing of the frame. When the process requirements allow, it is more economical to choose a small-span portal frame. Under normal circumstances, the optimal spacing of portal frames is 6m-9m. When large-tonnage cranes are installed, the economical column spacing is generally 7m-9m. It should not exceed 9m. When it exceeds 9m, roof purlins, crane beams and wall frames The amount of steel used in the system will increase accordingly, and the cost is not economical.

 

 

In the multi- and high-rise steel structures, the engineering volume of the floor structure system occupies a large proportion, which has an important influence on the work performance and cost of the structure. When determining the floor structure plan, the main consideration is to ensure that the floor slab has sufficient plane overall rigidity, which can reduce the weight of the structure and reduce the height of the structure layer, which is conducive to convenient on-site installation and rapid construction, and better fire protection and sound insulation Performance, and easy to lay the pipeline. Common floor slab practices include: profiled steel plate composite floor slab, prefabricated floor slab, laminated floor slab and ordinary cast-in-place reinforced concrete floor slab. At present, the most commonly used methods are profiled steel composite floor slabs and ordinary cast-in-place reinforced concrete slabs. When using these two methods, considering the combination of cast-in-situ slab and steel beam to form a combined beam that bears the common force, the height of the steel beam can be effectively reduced and more steel can be saved.

 

 

In the high-rise steel structure, the frame column adopts the circular steel tube concrete column, and the beams and slabs adopt the steel-concrete composite structure. The total steel consumption is greatly reduced compared with the ordinary steel structure, which can effectively reduce the project cost.

 

The advantages of steel structure construction determine that it will have strong vitality. In the design stage, technological innovation, material selection, and design optimization are the key stages for controlling construction costs and promoting the industrialization of building steel structures.

 

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
空气型封闭母线槽| ChemChina| MPO涂层测厚仪| BPYJVRP变频电缆| 振动试验台| 超声波振动筛| 不锈钢储热式工业| 梁山融悦二手设备经营部| 浓水回用设备| 威海免熏蒸包装箱| 上海念慈机械设备| 真空共晶回流焊接| 实验室水质分析仪器| 德国BURKERT电磁阀| 圆盘桨叶干燥机| 试验箱生产厂家| 液下泵| SANKO山高膜厚计| 无尘布| 大功率变频电源| 便携式一氧化氮检测仪| 冷媒回收机| 车内| 防爆型风速传感器| 建材可燃性试验炉| 真空感应悬浮炉| 新能源装载机| 便携式贺利氏测温仪| 移动式皮带机生产厂家| 全自动锯骨机| C6流式细胞仪| 土壤溶液取样器| 反控版自动| 油微量水分测试仪| 实验室真空泵| 圆盘| 测力计| 西林瓶灌装加塞轧盖机| 滴眼剂灌装生产线| 利浦顿蒸汽发生器设备生产厂家| 卡米洛ELISA|