STEEL CONSTRUCTION PROCESS IN

Time:[2017-1-18]  Hits:4083

Foshan steel construction, such as factories, airports, etc., we are familiar with, but many users of steel structure construction program is not concerned about, but the steel construction program for the construction of such a great impact on quality, what steel construction program? The main content of the steel structure construction program which? Roof construction is very important to the house, the application of steel structure is also increasingly popular. However, steel surface corrosion has been the impact of steel quality, life of the main factors. Corrosion of steel structure a lot of incentives. Environment, should avoid long-term exposure to steel structures in relatively high relative humidity environment, and the environment of acid, salt and other chemicals will accelerate the corrosion of steel; followed by the design is unreasonable from the current point of view, the main impact of steel Surface corrosion of natural factors, paint the aging, the reasons for the construction and so on. These are also the main factors that cause the corrosion of steel surface.

    Thus, for the Foshan steel structure, the initial construction of the steel structure for the address of climate factors, the choice of paint, as well as the degree of professionalism of the construction unit must have a certain requirement, in these relevant factors, the combination of steel structure engineering Of the overall quality assurance will have a better effect.
 
Specific measures are:
(A) to ensure that the effect of treatment of steel substrates meet the standard requirements (B) the use of multiple coating method to reduce the anti-rust primer pinhole defects.

(C) pay attention to the top paint, intermediate paint coating construction conditions and construction methods.

(D) to take the coating thickness detection, pin hole detection, coating adhesion detection.

Heavy-duty, long-lasting coatings consist of a primer, intermediate coat and topcoat.
From the long-term economic considerations  spray coating the most economical   but a one-time investment  good construction of the coating can be 10 years
No maintenance is required. Epoxy zinc-rich primer + epoxy-iron intermediate paint and acrylic polyurethane long-lasting protection system has a better economy.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
平板式泡罩包装机| 高压相位仪| 压缩强度测定仪| 工业传动链条| 无菌均质袋| 塑胶材料垂直变形性能测试仪| 物联网高低温试验箱| 搪玻璃冷凝器| 吊篮租赁| 导电纤维| 液压万能试验机| 呼吸拉伸缠绕膜| AT1120| 自动尺寸测量仪| 酸雾吸收塔价格| 气密性检测装置| 尘埃粒子计数器| 机械振荡萃取仪| 皮革耐折试验机| 艾斯派Aspiringrp| 彩钢板围挡| BLE低功耗测试仪| Excelta镊子剪钳| Hed4压力继电器| hdpe土工膜| 船用通信电缆| 超级循环高温油浴锅| 智能闸门开度仪| 宏力小坦克便携地磅| 中医证侯模拟人系统| 氮化硅陶瓷烧结炉| 多功能辐射监测仪| IPX9K高温高压喷水| 100KVA| 螺口融合瓶| 香料| 烟气检测仪| 广东次氯酸钠发生器厂家| 1速度传感器| 油压机| 电动圆形插板阀|