Three kinds of steel space truss construction method Guangzhou

Time:[2016-7-13]  Hits:3745

Guangzhou Steel grid construction, there are three methods, namely, high-altitude assembly method, the overall installation method, sliding method altitude. Here Guangzhou Steel Xiaobian you explain.

First, the high-altitude assembly method. Steel truss assembly is the use of high-altitude installation, the location where the design erection bracket assembly, and then use a crane to grid member sub-element air hanging to the design position, but the amount of the bracket assembly method is very large, high-altitude work more. This method is more suitable for high-strength steel truss bolted or bolt ball node.


Second, the overall installation method. It will be assembled into a whole grid on the ground, then lifting equipment to upgrade its entire design of the place is fixed. This construction method altitude less work, less assembly bracket, but also to ensure the quality of welding, which is focused on technical and lifting equipment. Overall installation method spherical joints steel truss apply. For different lifting equipment, installation as a whole is divided into multi-machine method Hoisting method, pull the lever lift-off method, electric screw lifting method.

Third, the high-altitude sliding method. In recent years, high-altitude construction parallel slip more and more, this approach is often more suitable for Guangzhou Steel theaters, auditoriums and other projects. Mostly on the grid auditorium bleachers set up assembly platform Tower, a building element assembly is completed, and then assemble the second unit, and so continue to slip forward assembly, direct access to the entire grid assembly is completed and moved into the place position.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
50KN数显电子万能试验机| 电感测试仪| 伺服油压机厂家| 3D压痕仪系统| 青岛丹佳净化设备| 德惠风机价格| 景区负氧离子监测系统| 实验室双螺杆色母造粒机| 多功能三合一过滤机| DT1050| 气动调节阀| 测力计| 金属电镀层厚度测试仪| MIDORI无触点| 标准时钟同步系统| 二手储运设备罐体提取罐| 液体微生物气溶胶采样器| 越宏化工设备| 浓水回用设备| tek经销商| 洁净室气密测试| 白酒甲醇乙醇检测仪厂家价格| 订做步入式试验箱| 淘气堡招商加盟| 高压压缩机| 恶臭监测仪| 散装饲料运输车| 恶臭在线监测仪| 电气柜体封堵防凝露| 手动红外压片机| 服装流水线| 壁温热电偶| 500T反力框架| 探伤黑光灯| 手动单道移液器| SF52露点变送器型号| 楼板测厚仪| 金联宇电线电缆| 全自动预制菜设备| 高空电动推拉棚| 北京雅士林试验设备|