Foshan General Steel measuring program

Time:[2016-7-6]  Hits:3877

As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

 

First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

Sixth, protect the measurement is completed reference point, the reference lines,

7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
不锈钢加热探杆| 便携式拉曼光谱仪| FESTO费斯托不锈钢接头| 皮带打滑开关| 深视力检测仪| 创净| 实验级| 果蝇培养箱| 退扭机| 郑州恒扬实业| 方向盘扭转弯曲疲劳试验机| 绿脓杆菌检测培养基| 801高斯计| Zarges箱子扶手梯子| 经济型橡胶| 土壤时域反射计| 全国大型水系统阀门生产厂家!| 96针洗板机| 实验室粉末压样机| 日本三丰千分尺| 气相离子迁移谱| 酸露点仪| 低噪声电流前置放大器| 排水管钢模| 工业专用高压风机| 能研NOHKEN液位| 数控四柱液压机厂家价格| ROHS2.0快速检测仪| 电镀废水处理| TB透浦式鼓风机| 电伴热带厂家| 微型气象仪| 工业专用高压风机| 防水涂层测厚仪| 激光焊接机| 自动拧螺丝机厂家| 去离子水机| 管廊支架| 宁津县蕾特打包机械厂| 铝合金配件| 【山东凯斯锐】专注于钢结构智能设备|