Foshan main steel members (b)

Time:[2016-5-14]  Hits:4770

welding
(1), the general requirements
a welder required certificates.
c welding, flux before use technical specifications shall be specified baking temperature baking.
c welding welder should be reviewed before the handling member joint quality and pads, if not meet the requirements, in order to be qualified welding after trimming.
(2) the welding process
a Before welding, construction workers assessed according to the process of compilation of the welding process instructions, specific guidance welder welding work.
b raining or snowing non-open-air welding.
c positioning welders should have Welder certification, welding materials used should tack welding and welding materials the same official, tack welding may not have pores, cracks, slag and other defects.
d same position should not exceed twice the number of weld repair.
(3), H-beam welding
All members of the project H-beam welding using LMZ-1500 automatic gantry welding machine, automatic submerged arc welding, gas shielded welding machine welding, to avoid weld, slag, weld defects.


test
(1) After completion of the processing member, in accordance with the processing map and (GB50205-2001) of the relevant provisions into acceptance.
(2), member acceptance criteria for the acceptance of construction quality of steel structures (GB50205-2001) and construction drawings.

Painting, NO
(1), the general requirements
a member rust and paint work should be carried out after the quality inspection qualified member.
b Painting Lobe coating construction personnel professional training, after familiar with the performance of coatings and coating job essentials, before construction.
(2), the management coatings
A variety of coating materials of different specifications should meet the design requirements.
b component coating technology used must comply with the conditions of professional standards, and product certification. Over use of custody of the paint should be re-inspection, qualified before use.

Factory
Lifting member according to plan will be qualified batches packaged, transported to the site.

Admission preparation
(1), construction workers and related personnel arrived at the construction site preparation work before installation.
(2), the former construction workers were entering education, quality, duration, safety and other aspects of the work to fully implement the team, for all the difficulties of design drawings, construction program, focusing on a comprehensive understanding.
(3), with the Party-site tests, such as raw materials, components, and equipment disposal site access road, water, electricity, housing, construction coordination and determine the amount of each process and construction plans, and other construction units Cross Operations Coordination plan.
(4) of the construction process (base buried and associated facilities) for review, to ensure the quality of embedded parts, elevation, the central axis, geometry, parallel degree correct. Do the handover procedures.
(5), according to the requirements of the steel works, ready to upgrade machinery, equipment, tools, materials planning and special tools; equipment to do the preparatory work and auxiliary materials, such as cranes, welding machines, measuring instruments, hand tools and other aids , implement vertical transport conditions.
(6), inspection and acceptance steel components positioning axis, elevation, and make the steel member installation guides actinomycetes work;
(7), is responsible for the installation of steel components transport lifting, positioning, calibration, fastening bolt, seam welding installation work;
(8), according to the actual situation of the construction work planned to make necessary adjustments and additions and submitted to the project manager for approval.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
HUBNER编码器| Rexroth双向节流阀| 双85恒温恒湿试验箱厂家| 空气型封闭母线槽| 华仪SE7430| 青岛阿里巴巴诚信通授权渠道商| 除尘设备| 便携式拉曼光谱仪| 3351电容式差压变送器| 4WE电磁阀| 六联异步混凝搅拌器| 智能物联网网关| 自动倒角机| 空气弹老化试验仪| 东莞二级压缩空压机厂家| 台州市路桥宇澳机械厂| 华铝铝型材| 高低温箱厂家| 干蒸设备| 堆焊耐磨板| 扭矩测试仪| PAM加药装置| 钢结构厂房| 托育早教中心设计| 高速数控转塔冲床| 日本齐藤光学数码显微| 船用复合铝蜂窝板| 厂家| 巢湖聚氨酯保温管| ULR分体式超声波液位计| 爱华AWA6228+声级计| 智能射频导纳料位计| 上海自仪四厂| 平板式泡罩包装机| 方形铸铁镶铜闸门| 铝包钢护栏网| 三乙二醇二甲基丙烯酸酯| SBR池潜水推流器| lwgy智能涡轮流量计| 消声设备| 多探头数字式照度计|