钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > Steel Engineering strength bolted connection inspection requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

Steel Engineering strength bolted connection inspection requirements

Time:[2016-3-9]  Hits:4057

Steel Engineering strength bolted connection inspection requirements

High strength bolt friction surface should be smooth, dry, iron oxide surface may not have skin, burr, burr, paint and oil, remove loose rust with a wire brush along the direction perpendicular to the force. And shall not be installed in the rain.

Use a torque wrench should be required to calibrate torque wrench set to respond before the class to be checked before using.

Guangzhou Steel in strict accordance to the surrounding extended from the middle of the order, the early implementation of twist, twist the end of the construction technology program, non-step method of direct final twist. A high-strength bolted joint on bolt group should be central to start the installation, one by one tightening, tighten it again each application are different colors of paint be marked to prevent leakage twist. High strength bolts fastening parts order from stiffness to unfettered free end be carried out from the middle to the edges, so that the adhesiveness between the plates.

Should be free to penetrate the high-strength bolts bolt hole. When reaming, iron may not fall into lamellar. Reaming shall not exceed 1/3 of one joint bolt hole, reaming diameter of not greater than 2 mm aperture together. High strength bolts were forbidden to use gas cutting reaming work.

Guangzhou Steel long-term storage of more than six months or improper care caused by rusty bolts and contaminated dirt, may alter the performance of the torque coefficient or bolts of high strength bolts, as the case should be cleaned, rust and lubrication process, and the torque coefficient or bolt pre-tension test, qualified before use.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
约海姆液压升降台| 热水高压清洗设备| 海事卫星电话| I型胶原N末端肽试剂盒| 二级智能生物安全柜| 东莞市常平百年电子测试设备厂| 压力机自动化| 不锈钢生物容器| 中山振动盘| 恩德斯豪斯E+H变送器| 膏体灌装旋盖机| 番茄酱分装线| 无管道净气型试剂柜| 畜牧电子地磅秤| 双液系沸点测定仪| ELEKTRIM| 退扭机| 帕斯菲达| 电动装载机品牌| 板材成形试验机| 一体式真空浓缩仪| 皂化液在线分析仪| 工业气体在线分析仪(激光拉曼气体分析仪厂家)| 玻璃钢生物除臭设备| 耐划痕试验机| 浙江省nalgene代理| 纳米光子消毒设备| 南京兰伯艾克斯生物科技| 电脑线号机| PDS873远传压力变送器| 电磁阀蒸汽阀| 六相继电保护测试仪| StrongBlockBuffer阻断剂| 天然气报警器| 盐雾试验机| 多合一气体检测仪| 磁力起动器| Hypersep固相萃取| 四川污水处理一体化设备厂家| 电表箱专业制造商| 平锻机|