raw materials and finished steel structure approach

Time:[2016-1-23]  Hits:4432

Guangzhou Steel tells you: raw materials and finished steel structure approach

(1) Guangzhou Steel Engineering steel materials used should be consistent with the design documents and the relevant existing standards, and have quality certification document, the admission after passing inspection before using.
(2) site acceptance steel, in addition to compliance with "Steel construction norms" gb50755-2012, there should be consistent with existing national standards "Steel Construction Quality Acceptance" gb50205-2001 of. Belonging to one of the following steel, should be carried out in full retest sampling:
① foreign steel imports;
② mixed batch of steel;
③ thickness equal to or greater than 40mm, and the design of the performance requirements z slab;
④ safety rating for a building structure, large span steel structure, the main force of the steel components used;
⑤ steel retest design requirements;
⑥ doubt on the quality of steel.
(3) the requirements of the steel sheet in the thickness direction, z15 grade steel for each inspection lot by the same brand, the same heat, the same thickness, the same delivery shaped steel plates, each batch weighing not more than 25t; z25, z35 grade steel sheet by sheet reinspection.
Standards (4) steel imports reinspection sampling, sample preparation and test methods shall design documents and contract execution. Customs inspection results should be approved by the supervising engineer, later recognized as an effective material retest results.
Welding materials (5) for important welds, or welding material quality certificate document is doubt, should be sampled retest, retest when the wire should press five batches (quite furnace batch) to take a series of tests, the electrode It should be in three batches (quite furnace batch) to take a series of tests.
(6) ordinary bolts as a permanent attachment bolts, when the design document or its quality is doubtful, should be a minimum tensile load bolt physical reinspection, when reinspection each size bolt checks 8.
(7) High strength large hexagon head bolts connecting deputy and torsional shear bolts connecting deputy should each have a torque coefficient and tight coaxial force (Pretension) factory qualified inspection reports, and comes with the box. When the bolts connecting deputy storage time more than six months after use, the relevant requirements should be re-torque coefficient or fastening shaft force test, qualified before use.
(8) high-intensity large hexagonal bolts connecting deputy and torsional shear bolts connecting deputy should individually tightening torque and axial force coefficient (Pretension) reinspection, the test bolt construction bolt batch should be installed on-site at random, 8 sets of connections made each batch extraction retest.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
钠基膨润土防水毯渗透系数测定仪| HXTS多极管式滑触线| 脱硫搅拌器| 折弯机| 沙门氏菌PCR检测试剂盒| 宁波气动量仪| 上自仪四厂| 挥发性有机采样器| 工程机械配件| CIP在位清洗系统| 垂直净化振荡器| h型钢切割设备| 排污过滤器| 分体式直流高压发生器| 彩色透水路面| ZW20| 淄博红日真空设备厂| 自动化反应量热| KANON扭力起子| 自动焊接机械手| 喷砂机厂家| 电磁阀防爆线圈EM551090| KistlerMorse| 深层膜堆滤芯| 数控| 网带烘干机| 越野滑雪板| JIENSI二甲苯气体检测仪| 干化设备| 轻质抗爆墙一平方米多少钱| 美恩斯直流电源| 不锈钢松套法兰| OXOID酵母粉提取物| 叉车电瓶| 底座式曝气机| 防渗土工布厂家| 成都L245N管线管批发价格| 美国PE耗材配件| 防腐衬里| 特材丝网| 防水盒|