Guangzhou Steel news: the Zhoukoudian cave ape started

Time:[2015-8-19]  Hits:4913

Guangzhou Steel news: the Zhoukoudian cave ape started "plus top"

 

Yesterday, the Zhoukoudian cave in the heart of the ape-man maintenance shed officially started construction. The maintenance shed in isolated rain, snow, hail, sun and other natural factors direct effect on the body at the same time the site will be possible to recover up to 20 million years ago, the original form.

The program of "minimum cover, to eliminate hidden dangers, with nature," the planning principles, to be built in the ape-man hole covers an area of ​​more than 3700 square meters of the maintenance shed. Maintenance shed span of 77.5 meters from north to south, east-west span of 54.5 meters and a maximum height of 35.7 meters, the use of space monolayer shells steel.

Site Management Office official said, the maintenance shed is the minimum required coverage area and height volume planning, site of the body in order to minimize interference, isolated rain, snow, hail, sunshine through the outer and inner layers of the roof build-planning, etc. the direct effect of natural factors on the ruins of the body, of the ape-man hole in the effective maintenance, while ensuring construction planning and site environment harmony. Guangzhou Steel

It is understood that the project is expected to end in late 2016. Pre-engineering will not cause too much impact on the visit, the site will divide the late opening hours.

According to reports, in order to make the Zhoukoudian site surrounding environment has been improved, the site perimeter has closed, shutting down the site surrounding nine cement plants, 11 shaft kiln production lines, 40 non-coal mines, 13 coal mines and other pollution and destruction of the natural environment industrial and mining enterprises, governance of the Zhoukoudian River and surrounding abandoned mines, planting more than 1,000 acres. Guangzhou Steel
■ Difficulties

1. Steel site construction is limited.

The construction site is located in the core area of ​​the ape-man cave, in the construction process does not destroy the ruins of the body, so the site layout is limited.

2. messy construction site environment.

Ape cave dense vegetation, narrow passageways, restricted construction conditions, lifting machinery is arranged with a certain degree of difficulty.

3. steel equipment and welding difficult.

Maintenance shed a single layer lattice shell structure, shape messy, slope, span, welding capacity, equipment and welding of steel structures request high.

The steel construction strict security measures.

As the construction site is located in the mountain below the maximum network shell drop of more than 30 meters, so the construction safety particularly high fall and fire will be among the control points of the project.

■ Introduction

Zhoukoudian cave ape's heart, and found about 40 representatives of "Peking Man," an individual close to 200 human fossils, more than one hundred thousand pieces of stone tools, several layers of ash and hundreds of kinds of animal fossils, is the most scientific value of the site iconic accumulation body, preserved ruins of the most complete stratigraphic sequence and the wealth of scientific information.

"200,000 years ago, there is a natural ceiling, but after the collapse when corrosion is now to be discovered." Site Management Office official said that since the twenties to explore, ape cave long suffered from sun, rain wind erosion and other natural forces of destruction, and therefore, from 2009 onwards, the joint to ape the West sectional hole excavations carried out maintenance work to clean up the disease according to the geological conditions and expert opinions, the cultural relics department and the Chinese Academy of Vertebrate Paleontology and Paleoanthropology, and start the Ape Man Cave collection maintenance plan, argument.

Tsinghua University Architecture Planning Institute Planning "Zhoukoudian first place (ape hole) Maintenance Plan Building Plan" was approved by the UNESCO World Heritage Centre and the National Heritage Board in 2013. Guangzhou Steel

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
能研NOHKEN液位| 聚乙二醇二甲基丙烯酸酯| 钢结构网架| 3000EX(美国英思科气体检测仪MX4MX6)百科| 低应变检测仪| Rubis实验室镊子| 回转窑| 第三方可靠性检测| 上海普路通机械| 全自动糖衣机| 聚醚砜过滤漏斗| 美国PARKER电磁阀| EJA110A差压变送器| 免疫球蛋白国际标准品| 恒温恒湿试验箱| 耐辐射橡胶圈| 台式低速离心机| LED平台灯| 伺服油压机厂家| 米顿罗搅拌器| 塑胶锁码面板| 在线式露点仪| 雷达流速监测系统| 超净工作台| 超声波焊接机.热板机.振动摩擦机.高频诱导机.金属焊接机厂家| 长沙市岳麓区中南制药机械厂| 赛斯特冷冻系统| TR6900多参数水质测定仪| 水分在线检测仪| 安全试验一体机| 防爆墙生产厂家| 金斯瑞福建总代理| 日本齐藤光学数码显微| 淄博昌金化工设备| 金检重检一体机| 即用型透析袋| 医用品包装机| 定扭矩电动扳手| 王研式透气度| 三点抗弯试验机| minco热电阻|