钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > Guangzhou Steel tells you: fireproof coatings inspection process after construction
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

Guangzhou Steel tells you: fireproof coatings inspection process after construction

Time:[2015-8-12]  Hits:4737

Guangzhou Steel tells you: fireproof coatings inspection process after construction

Fireproof coatings as a construction material in the construction is completed this process must be tested, then test for fireproof coatings how have requested it, following Guangzhou Steel come to find out.

1, fireproof coatings test should provide the following reports:

(1) fire-resistant fire retardant coating countries view the institution of the limits to view reports and view reports of physical and chemical properties, fire supervision department issued a production license and production of the factory's product certification;

(2) the construction site to view the document and quality management during the construction process submissions major questions;

(3) See shaded engineering inspection items inspection records;

(4) completion report after the completion of the single and self-test report;

(5) the amount of purchase orders fire retardant coating;

(6) Fire paint coating edge construction side view records.

Fireproof coatings should be included in the "construction of fire facilities View order", "construction project fire inspection norms" and other technical specification, all painted interior and exterior coating of steel structure fire test before the completion of construction, the agency must have a view of the steel body structure fire retardant coating to view compliance report. Fireproof coatings viewing and inspection is mainly based on: GB14907-2002 "steel structure fire general technical conditions", GB50205-2002 "steel works and construction quality inspection norms", CECS24 "fireproof coatings technical specifications." Guangzhou Steel steel structure fire fire resistance of measuring methods, should be based on the type of environment and concluded by the fire, such as: petrochemical enterprises to use fireproof coatings, its fire resistance test should be based on temperature curve hydrocarbon fire determined before more realistic.

After brushing fire retardant coating on steel, greatly improving the fire resistance of steel, but in fireproof coatings applications, there are coatings improper selection, poor construction management, completed inspection, viewing and many other non-standard questions , seriously affecting the quality fireproof coatings.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
Agilent| 英思科GTD| 还原柱| 压电材料测试仪| Excelta镊子剪钳| 刀塔维修| 甲醇水分测定仪| 接近开关| ideal| 熔体流动指数仪| 超声波清洗器| 调频式串联谐振变压器| 生物制药洁净车间| 北京铝蜂窝板厂家「生产加工定制」铝蜂窝板| 土壤时域反射计| HAST高加速应力测试仪| 40cr无缝管价格| 综合实验室污水废水处理设备| CIS大体积冷进样系统| 09CrCuSb钢管| 中医证侯模拟人系统| 思美音频处理器| 液压制动器型号| 生物试剂灌装机| 表面污染检测仪| 油液监测系统| 不锈钢实验室捏合机| 胶粘带持粘性测试仪| 色谱数据工作站| 羟基丙烯酸树脂| BURKERT电磁阀| NIKKISO加药计量泵| 2多用途设备报警器| 砌墙砖试验模具| 二手ICP等离子发射光谱仪| nbiot物联网阀控水表| 振动监测保护仪| 自动焊接机械手| 液氮真空管| 照明箱计量电表| stenflex补偿器|