钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > Guangzhou Steel says:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

Guangzhou Steel says:

Time:[2015-7-4]  Hits:4179

Guangzhou Steel says: "The construction quality inspection norms steel works' quality requirements and inspection provisions

(1) Guangzhou Steel Steel: The steel is one of the following conditions should be carried out sampling re-examination, re-examination of its results should be in line with national commodity specifications and design requirements: imported steel; steel mixed batch; thickness equal to or greater than 40mm, and slab design performance requirements.
Inspection reports of high strength large hexagon head bolts convergence deputy and vice torsional shear strength bolts factory should join with me respectively with the tightening torque coefficient and axial force (pre-tension) to: (2) convergence with the fastening member specification.
(3) Guangzhou Steel Engineering steel welding: carbon steel should be cooled to ambient temperature in the cold, low-alloy structural steel welding should end after 24h, conduct inspection of welds.
(4) Guangzhou Steel Fasteners convergence projects: Normal bolt when the bolt as a permanent link, when the design requirements or II statement of their mass, should be a minimum tensile load of the bolt physical reinspection. A convergence of high strength bolts, bolts should be separately produced and device unit for anti-slip friction coefficient test and retest the surface. 2 high-strength hexagon head bolts screwed convergence deputy final end 1h after the final screwing torque check should be carried out within 48h. 3 deputy final convergence of high strength bolts screwed threaded bolts exposed should be 2 to 3 buttons, which allow 10% of threaded bolts to reveal a button or 4 button.
(5) steel member assembly works: Cranes and crane truss girder should Deflection.
(6) The single steel apparatus engineering: all vertical single steel main structure of promised deviation should be consistent H / 1000, and not greater than 25.0; all the twists and turns of the promised plane deviation should be consistent L / 1500, and not greater than 25.0. Guangzhou Steel

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
超声波均质| 双向反射函数测量系统| Keysight网络分析仪| 仓储笼| 广东电缆厂家| 金属应力检测设备| TOA离子计| 织物摩擦带带电电荷量测试仪| 标准铂电阻温度计| 洁净传递窗定制| 电脑自动端子机| 无锡涡街流量计厂家| 挤塑板厂家| 按键开关厂家| 双螺旋挤压机| 中心温度记录仪| 液氮罐| 耐辐射橡胶圈| 防滑标准板| 【VERTIV】维谛UPS| 设备配套吸尘器| 电热毯机械强度| 果品脱水干燥机| 油液颗粒计数器| 双色石英管液位计| 陶瓷砂轮| 市政路灯| 无铁硫酸铝厂家| 排水管道水下封堵| LCR测试仪| 精密铸造配件| 工控主板| TX7寸显示触摸屏| 喷砂设备配套风机| 神经营销实验室| MKVVRP| 美国PE耗材配件| 红外快速水分测定仪| 不锈钢加盖| 外转子轴流风机| 陶瓷pc砖|