钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use

Time:[2015-6-24]  Hits:4703

Guangzhou Steel News: Exhibition Kunming Steel Works successfully put into use
   
June 16, the third China Expo South is concluded, marking the construction of the Dianchi Lake in Kunming World Steel Works Exhibition Center project successfully put into use, and set to open steel big screen debut "Peacock" in the face of domestic and foreign visitors to the exhibition style. Guangzhou Steel
Dianchi Lake in Kunming World Exhibition Center project Steel Works Co., Ltd. invested by the construction of a Yunnan, Ltd. is responsible for the outer steel mesh deepen the design, manufacture, installation.
It is reported that the world's Convention and Exhibition Centre, Kunming Dianchi steel mesh semicircular distribution to the peacock as prototyping, volume 1.1 million tons, the use of domestic rare, Yunnan's first variable cross-section of bending and torsion of thin-walled shaped space fully welded structure, application of bending and torsion member total of more than 4100 pieces, bending and torsion ranks first in the number of components as much as similar projects in the country, and the viewpoint of bending and torsion of each member, there was no common direction. Especially in the main hall of the sequence of two vases, bending twist unprecedented degree, described as "like a column of non-column, non-beam like beam." Vases, 24 meters high, each 123 vases made of steel components assembled, each bar weighing 163 tons, the degree of bending and torsion vases shall also be a Yunnan most. The project was September 27, 2014 began lifting, and on January 29, 2015 two days ahead of the cap, which took 125 days. Guangzhou Steel
Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
吉发机械| 液槽冷热冲击试验箱| wb检测技术服务| 布氏硬度压痕测量仪| 防欺骗抗干扰同步时钟| 反应性及反应后强度| Campbell数据采集器| 氢气气体传感器模组| 砌墙砖抗压强度一次成型试模| 刚体铜滑触线| 中国农业机械化信息网| 上海家君真空仪表| 建筑门窗保温性能试验机| 婴儿纸尿裤包装机| 印刷电机| PCT高压蒸煮老化箱| 沙门氏菌PCR检测试剂盒| 板式臭氧发生器| 全自动抗干扰介损测试仪| 无锡阿克尼机械| I型胶原N末端肽试剂盒| 空调过滤器| 快递自动称重系统| 膜厚仪| 进口清洁度分析系统全自动测量仪| 螺旋叶片| 显微镜荧光光源| 污泥界面仪| 自动沸程测定仪| 机场护栏网| 上海吊秤厂家| 砌墙砖抗压模具| 高速离心机| 煤灰熔融性测试仪| 超声波设备清洗机| 气动潜水推流器| 恒温恒湿试验机| 氢能密封件| 生物质木块颗粒熔铝炉| 柱塞泵| nbiot物联网阀控水表|