钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > Guangzhou Steel News: Olympic main stadium steel construction schedule more than half
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

Guangzhou Steel News: Olympic main stadium steel construction schedule more than half

Time:[2015-6-6]  Hits:4712

Guangzhou Steel News: Olympic main stadium steel construction schedule more than half


Afternoon, in Yichang City Olympic workers to operate heavy construction equipment were the main stadium roof installation. Currently, Yichang Olympic main stadium construction progress of steel has more than half, the museum brick-based construction progress has reached 40 percent. Guangzhou Steel

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
静音| ODM蠕动泵| MPbio土壤提取试剂| 山东风淋室| 反光粉| 租赁立体车库| 视频光学接触角测定仪| 皮带输送机| 海南在线监测| 家用抽水机| 晶体定向仪| 玻纤吊顶板| 油墨印刷废气处理设备| 气相离子迁移谱| 环境湿热老化箱| 精密数控平面磨床| 钮扣拉力试验机| 剥离力测试仪| 泥沙震动筛设备| 样品定容| 蜂窝块状沸石分子筛| 【官网】天津雷公焊接材料| DC53模具钢| 日本TET静电ESD测试仪| 真空开关真空度测试仪| 超重型斜床身铣打机| 二手仪器仪表| 工程塑料隔膜泵| 铝制风机| 2G高带宽示波器| 真空| 苏州电子天平| 普罗名特计量泵| 变频介质损耗测试仪| 意大利SEKO计量泵| 河道护坡砖| 多工位电池片焊带拉力计| 煤炭氟氯测定仪| 水平垂直燃烧试验仪| 四氟喷涂| 绕组匝间冲击耐电压试验仪|