钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > Guangzhou Steel news: construction steel components assembled provision
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

Guangzhou Steel news: construction steel components assembled provision

Time:[2015-5-20]  Hits:4181

Guangzhou Steel news: construction steel components assembled provision

Assembly platform, mold, etc. should be smooth and firm, in order to ensure the accuracy of the assembly member.
Necessary reference to the drawings, processes and quality standards, and the characteristics of the coupling member, the corresponding assembly measures.
Should consider the possibility of welding, welding deformation is minimized, and easy to correct to conclude that taking one or more assembly assembly, that is, first assembled, welded into a number of parts, and were correct distortion, and then assembled into components.
Welding should consider shrinking margin after welding allowance.
All parts of the process should check its standards, size, quantity meets the requirements, all parts and components to be corrected, connecting the contact surface and along the inner margin of the range of 30 ~ 50mm weld rust, burrs, oil, ice should be clean and clear.
Where the hidden parts after assembly, shall be subject to confirmation QC qualified to carry out welding or external hidden. After assembling the first batch of members, shall be subject to a comprehensive inspection QC qualified confirmation before continuing assembly.
If students splice splice, in order to reduce welding stress, easy to correct deformed, should stitching, welding, the test, qualified after the correction, and then assembled.
Structure should be based on factors, welding method, welding sequence, etc., determine a reasonable order of assembly, generally advised major parts, after minor parts, the first intermediate ends after the first horizontal-vertical, outside after the first interior, in order to reduce distortion.
When the clamp assembly, when the removal of the fixture can not be shot down with a hammer, cut gas cutting applications, they are not to damage the base material of the remaining burr, slag grinding should be clean.
Steel splice width of not less than 300mm, length less than 600mm; steel splice length of not less than 2 times the cross-sectional diameter or the long side, and not less than 600mm. All are full penetration welding seam weld on the fight, qualified 100% ultrasonic testing; thickness ≤8mm, by other methods (X-ray or drilling, etc.) check. Guangzhou Steel

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
料位开关| 超声波清洗器| 精密铸造配件| 计划生育培训模型| GSS土壤成分分析标准物质| 多效污水蒸发器| 中国农业机械化信息网| Chiller| 储能安全测试| 泳池设备工程| 视频内窥镜| 海鲜漂烫蒸煮机| 国电南自PST693U| 护栏网| 色谱柱空柱管| 上海申贤恒温设备厂| 车库co浓度监控系统| 游泳池设备厂家| 无锡沐雅机械| 广场直饮水台| 打磨机专用除尘器| 数字示波器TDS3034C| 光缆垂直燃烧试验机| 电杆荷载挠度测试仪| 彩色压花地坪| 微气象传感器| 代运营| ZNCL磁力搅拌加热锅| 车床油雾收集器| 激光光谱仪| AGV用减速机| 人造板落球冲击试验机| 密析尔露点仪transmetis| 宿舍水电费管理系统| ideal| 汽气比值测定仪| 东莞端子线定制| 品胜配件| E4438C信号发生器| 取丝锥| 西林叉车生产厂家|