钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > Olympic Stadium is expected to use the end of the implementation of steel erection
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

Olympic Stadium is expected to use the end of the implementation of steel erection

Time:[2015-3-28]  Hits:4772

Olympic Stadium is expected to use the end of the implementation of steel erection

    March 24, located in the Olympic Sports Center Gymnasium Point Military steel erection project was implemented, marking the construction of the project entered the construction phase, expected to be completed by year end.

    It is understood that the stadium is 203 meters long, 112 meters wide and oval-shaped building, with a total of about 8000 seats, total construction area of ​​28,000 square meters, about 35 meters high, three reinforced concrete frame structure, one of the main functions used room, two-story platform for the audience, three local space for equipment, steel truss for canopy top. Metal roofing project in its overall shape is designed with "petals" morphology, surface metal plate texture, volume sense.

    In lifting the scene, chairman of the Urban Construction Investment Holdings Xi Wang Wei introduced the project construction, he said, the Olympic Sports Center project Yichang New "first four" key projects, is building the Olympic stadium is "a four Hall ", one in December 2013 officially started. When completed, will achieve competitive sports, public health, recreation, business office, show a high degree of integration of the exhibition, set-in-one, will become the new district to promote eco-point army, as well as the core city of Yichang New construction and development pole.

    Military Road, a point at the end of last year, opened to traffic, to accelerate the construction of hi Yangtze River Bridge, traffic is expected to end this year. With the constant improvement of the external environment, after the completion of the stadium, the public may have been built by the expressway leading to the stadium from the city center, fitness, spectators will be more convenient.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
光学接触角测量仪| 过滤洗涤干燥三合一| 不锈钢翅片管| 线材连续电镀| miRNA分离纯化试剂盒| 电子悬臂梁冲击试验机| 初效过滤器| 串联谐振电缆耐压试验设备| 三角瓶洗瓶机| 制砂楼| QJR交流软起动器| 电源适配器厂家价格批发| BERTHOLD伯托传感器| 土壤测氡仪| 双法兰限位伸缩器| 非标吊篮配件| 化工日化原料| 模具温度控制机| 螺纹护套| 大连依利特液相色谱柱| 河道护坡砖| GMP水系统验证| 三象限可控硅| 游乐场| 箱包试验机| 淄博海恒机械| 高效空气过滤器| 迷你离心机| 果品脱水干燥机| 模拟高低温试验箱订制| cytiva试剂耗材| 压敏胶热缩带| 数控钢筋弯曲中心| 真空PUMP维修| 铝型材挤压输送生产线| 护栏网| 激光多普勒血流仪| 振动监测保护仪| 专业冷却塔降噪隔声| 铣挖机| LORA无线报警系统|