钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > Environmental governance battle steel construction dust resolve this
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

Environmental governance battle steel construction dust resolve this

Time:[2015-3-28]  Hits:4796

Environmental governance battle steel construction dust resolve this "black hands"

Recently, at their own expense before the CCTV reporter Chai Jing shooting a documentary about the haze, "under the dome" attracted more people are concerned about the burning of coal and oil and petrochemical pollution. And a lot of research in the field of well-known large-V is not forget to remind the public on the microblogging: the real causes of haze in fact is a consequence of a region or city comprehensive pollution.

Status: haze rule most overlooked part - dust

This year's two sessions, the spokesman Fu Ying, when answering reporters' questions on environmental law firm, said the new "zero tolerance", "have teeth", where the pollution is not only mentioned in our traditional concepts familiar to industry emissions, waste pollution, the "zero tolerance" concept, an important part of the composition of the haze - dust, have a few days to get some attention to Beijing and other parts of the former two sessions, and the promulgation of the relevant statute of limitations city dust phenomenon.

It is reported that Beijing since March 1 this year began implementing the sewage charges, and the main condition for the object is the construction site dust, the charging process is the first major re-assessment of differential charges, we understand that the construction site dust management to achieve excellent grades Standard, 1.5 yuan per kilogram; achieving the rank of standard 3 yuan per kilogram; non-compliance, 6 yuan per kilogram; public rental construction projects, disaster relief and rescue works and renovation of residential housing construction dust waive the charges.

In fact, in most people's perception, and will consider the main source of haze is produced by burning coal smoke and car exhaust these two aspects, while the CAS survey in Beijing PM2.5 culprit has been described in published form One haze "culprit" fired only to 18%, the much-maligned automobile exhaust is only 4%, while the city has been neglected, but accounted for 15% of dust, until this year, "Beijing today," released the latest data show, "Green Beijing" construction site caused by dust and road dust accounted for about 30% of the total suspended particulate emissions.

It is foreseeable that with Beijing dust collection fee purposes, especially in major cities suffered haze troubled city will usher in the era of engineering dust charges. As a representative of green building, compared with the previous concrete structures, steel buildings on dust control has a greater advantage.

Future: energy saving building materials is the future trend of development

Premier Li Keqiang in this year's government work report pointed out the need to lay the energy conservation and environmental governance battle. Environmental pollution is a risk of people's livelihood, the pain of the people, to iron-fisted control. This year, the intensity of carbon dioxide emissions to be reduced by more than 3.1%, chemical oxygen demand, ammonia emissions should be reduced by about 2 percent, sulfur dioxide, nitrogen oxide emissions to be reduced by about 3% and about 5%.

Therefore, as a haze of construction dust core culprit will become this year's environmental governance "top priority." Data show that only a total carbon emissions, carbon emissions from traditional construction accounted for almost 50%, the proportion is much higher than the transportation and industrial sectors. In addition, since the average life expectancy of concrete building only 30 years, the concrete will be difficult to recover a huge security risk, and waste of resources, and other social problems, become constraints on urban development. Compared with concrete construction, with steel, metal as the main raw material of steel construction, the recovery of raw materials have obvious advantages. Data show that in the field of steel construction, steel recovery factor can reach 90%, steel and aluminum respectively 50% and 95%.

. "From the whole life cycle, steel building construction waste will not produce basic" vice president Hangxiao Sui introduced the use of prefabricated steel building construction mode, only the construction work, no pollution; steel buildings from an average of 80 year building life point of view, even if they are removed, the steel construction also to higher recovery, to achieve recovery of steel, steel, architectural glass, aluminum, timber and other raw materials, to eliminate "construction waste Rising" from the roots. Sui further introduction to building demolition when, for example, steel construction of the main structural materials recovery above 90%, representing a 60% reduction in emissions of conventional concrete building rubbish.

Moreover, steel buildings can also achieve "hidden steel in construction, steel hidden people" strategic reserves advantage. Statistics show that currently 95% of the British steel building construction steel has been effectively recovered; when the construction of roads in Japan, the workers will be laying a layer of high-quality steel in advance in the roadbed, and then perfused asphalt pavement.

The dust fee collection in Beijing, making the original developers favored concrete structures faced with cost, energy-saving, environmental protection, such as multiple tests, which give Hangxiao steel enterprises represented a good opportunity for development. It is reported that Hangxiao newly developed "a combination of structural steel beams residential system", to further shorten the duration of steel construction, not only to reduce costs, but also improve the room rate and seismic performance in energy saving while providing better living experience.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
中国建材机械工业协会| 钢结构网架| 日本AND水份仪维修| 英国G100二氧化碳分析仪| C型钢卷吊具| 硬齿面齿轮减速机| 水泥厂DCS集散控制系统| 防爆电子地磅秤| 诱蚊诱卵器| 西林叉车生产厂家| 全新冷藏集装箱| 蓖麻油酸| 潍坊实验台| 200C智能回路电阻测试仪| 轻质碳酸钙| 上海皓越真空设备| 隔离带岩棉复合板| 滴水淋雨试验箱| 冷再生机租赁| 激光衰减器| 智能数显控制仪| TT260测厚仪| 脱硫尾液废水处理设备| 移动泵车| 辐射报警装置| 细胞粘附力测量仪| 普罗名特计量泵| 管道木垫块| 护坡砖| 试验台| 手套箱检测露点探头| 托管代运营| 氯气| 手扳手拉阀| 氯化锂蒸发浓缩器| 西林叉车| 液压吊| 电缆滑触线轨道| 硬齿面减速机「型号全」| 光学影像筛选机| 自相关仪超短脉冲测量仪|