钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > 258 meters all-steel housing will be built in the member when the Lake
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

258 meters all-steel housing will be built in the member when the Lake

Time:[2014-11-19]  Hits:5451

■ building energy museum and the public to experience the versatility Trinity roller shutters. Foshan Steel

The country's highest all-steel residential building where? Lake in Xiamen. Yesterday, at the international building energy efficiency and green building to carry out the Forum, the deputy director of the Municipal Construction Bureau, chief engineer Lin branches disclose this audio.

At the forum, Lin branch focuses on the latest developments in Xiamen architectural industrialization and the housing industry.

Text / reporter intern Cai Shanshan Wangshao Liang map / Chen Lixin

[Steel] Pilot

Can greatly reduce the amount of cement gravel hundred percent recycled or degraded

Lin branch, said low-carbon steel housing, environmental protection, construction can greatly reduce the sand, stone, cement consumption, the main source of data used green materials, 100% recyclable or degradable, in the building demolition, most of the information can be with or degradation does not become waste.

He said steel housing fit the housing industry and the requirements of sustainable undertaken. Steel suitable for mass production factory, a high degree of industrialization, and is capable of saving, waterproofing, insulation, windows and doors, and other advanced finished in one set, sets, raise the level of the construction industry.

Currently, steel housing is Xiamen pilot, promotion, highlights remarkable. As under construction in Xiamen Regal Court, it is the choice of all-steel construction, without external scaffolding and wooden templates, most of the building material for recyclable materials, short construction period, less construction waste. Regal Court is the country's tallest all-steel residential building, 62-storey building height of 258 meters.

[Building] industrialization

By 2020 more than half of the new construction of industrial clusters formed on-site installation

September of this year, Xiamen approved the "National Housing Industry Modernization integrated pilot cities."

Lin branches that Xiamen has been the introduction of "new construction in Xiamen industrialization plan", the city's affordable housing first pilot; in 2015, at least in each district to organize a new building industrial building; in 2016, the building area of newly started projects without housing industry less than 30% of the total area of the city, and every year a sliding scale; by 2020, the formation of an integrated, systematic planning of the construction industry clusters, the city's building-mounted more than 50% year to start construction area.

The so-called installation architecture, not built at the site a little bit, but the structure of pre-made at the factory is good, then transported to the site installation.

In order to promote the construction of industrialization, has been located in Xiamen Haicang build demonstration park, the choice of "a garden multi-base" model of economic development headquarters, research and design industrial park full, integrated handle, agglomeration effects and demonstration leading role, for the construction industry lay the foundation for the promotion of the modernization plan.

Lin branch, at present, the park headquarters Lot has entered the construction phase of implementation. In the meantime, Haicang biomedical park b1 Lot # 4 plant, selection of precast columns, composite beams, reinforced laminated floor trusses, prefabricated wall panels and prefabricated plug stairs, parapets, the upper prefabricated rate of over 80%. This means that at least the upper part of the plant is mostly made at the installation site.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
无线远传蒸汽流量计| 建筑物拆除| 多联水喷射真空机组| 震动给料机厂家| 高低压压球机| 电动装载机品牌| 超声波喷涂设备| Plasma清洗机| 抗折仪| 沸石转轮+RTO| AXG电磁流量计| 卤化物光纤| 辐射仪| 南通博琅机械科技| 酸碱浓度计传感器| SOPTOP舜宇显微镜| 粘度仪| 气相离子迁移谱| 浙江安捷伦| 工业内窥镜厂家| 光伏钢边框设备| DEUBLIN杜布林| 微机温度控制箱| 燃气炸炉| CIP在位清洗系统| 四轮板式滑车| 漏水检测仪| ATOS上海办事处| 砂带拉丝机| PARKER进口液压泵| 生物降解塑料| 非线性快速温变试验箱| 大倾角输送带| 四氟补偿器| 土壤重容重| 夹心绿豆糕机| 钢制拖链生产厂家| PDS863液位变送器| pph蝶阀| 浮游生物鉴定仪| 辗环机|