钢结构_钢结构厂房_钢结构平台_钢结构加工厂家--佛山市胜邦钢结构有限公司

Language:CHINESESENGLISH

Home > News > Steel works construction schedule control content
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sbshouses.cn

Steel works construction schedule control content

Time:[2014-11-15]  Hits:5027

(1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented problems to be solved; in accordance with the contract period, the construction schedule objectives and project staging production requirements of the construction preparation work and the timing of the construction tasks to determine the interface between the various units of construction engineering, engineering jobs and full-site engineering; the use of water construction principle, segmental construction of scientific organizations to achieve three-dimensional and assembly-line plane, while the application of network planning techniques, the preparation of the implementation of the local network plan, according to a key line of work to achieve continuity and balance construction; construction works in the project schedule as the basis of the total annual projects, identified steel the image of progress and structural engineering resources required (including manpower, material resources, materials, equipment and funds, etc.) supply plan.
(2) the matter of schedule control include: the establishment of the progress of implementation of the system construction steel structure engineering controls; timely construction progress inspection, make a record, keep abreast of the progress of the implementation of dynamic; the progress of data collection and statistical collation, and with compared schedule, which found that if there is progress and the progress of the deviation predicted feasible modifications measures; readjust schedules and related plans and implementation; enhance on-site construction management and scheduling, timely prevention and treatment occur in construction technical issues, quality incidents and accidents, reduce the impact of these issues on the schedule.
(3) after the schedule control include: the timely acceptance of tissue engineering, process engineering claims, project progress data compilation, classification, cataloging and archiving and so on.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
济南围挡| 铝合金锻造| 施乐佰轴流防爆型风机| 抖音同款手表| BURKERT传感器| TT260测厚仪| 苏州科勒摩百科| 露点分析仪| 铜离子在线分析仪| 叠加式培养箱| 高频焊翅片管| 阿托斯ATOS阀门| 金属转子流量计| 功能母粒| 高精度智能配气系统| 改性沥青设备| 折光仪| 皮筏输送机| 自粘型鸡蛋棉| 烟台万捷机电设备| 压力变送器| 多参数水质在线监测仪| 发格售后服务| 个人辐射测量仪器| 420电热恒温水槽| 硅酸铝铁皮保温| 304不锈钢毛辊清洗机| 中药煎药机| 铲运机| 缓放继电器| 步入式| RS系列电阻器| 自相关仪超短脉冲测量仪| 小型过滤筛| 有毒气体探测器| 压力控制器| 三波长台灯| 氨水在线浓度分析仪| SUN插装阀| 企业电力微电网平台| 这些设备广泛应用于|