Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:4848

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
发光细菌生物毒性分析仪| PLC数据采集转换| 批发| 动物行为分析软件| 凝点倾点测定仪| 数控折弯机厂家| 天康耐磨热电阻| 热镀锌钢格板| 8000系列在线电导率仪| 铜丝网| 在线氯化物分析仪| 地源热泵一体机| 卫生级隔膜阀价格| 高尔夫球车电池| 无机涂料厂家【可自由调色】| 远程控制智能电表| 液氮真空管| 中效过滤器| 真空滤油机厂家| 空心钻头| 盐水低温冷水机| 纯电动装载机| 大功率多头数显恒温搅拌器| 超微超细粉碎成套设备| 高光照高光强培养箱| 浮动去毛刺| 磨床除尘器| HYDAC继电器| 经皮电刺激仪| 低温恒温反应槽| 皮革物理性测试仪| 酵母抽提物喷雾干燥机| 轻质碳酸钙厂家| 安徽春辉振动变送器| 农业机械学报| 临沂核心价值观生产厂家| 普发真空泵| 电子悬臂梁冲击试验机| KX补偿导线| 格栅板| 荧光定量检测试剂盒|