Key Points of Column Installation in Steel Structure Workshop Construction

Time:[2022-12-24]  Hits:2123

The steel column is one of the main components of the steel structure plant. As its name implies, the steel column is a column made of steel. There are two types of section forms - solid web column and lattice column. For the steel column device, the component shall be rechecked after mobilization and during installation, and the number, size, shape, connection hole orientation and other attributes shall be consistent with the drawings one by one before the component device construction.

 

 

1. Elevation observation points and center line signs shall be set before the installation of steel column components. For a plant project, the observation points and signs shall be set in the same direction, and shall conform to the following provisions:


First of all, the setting of elevation observation points shall conform to the following provisions: the setting of elevation observation points shall be based on the bracket (shoulder beam) bearing surface, and shall be set at the position convenient for observation of the column; For column without bracket (shoulder beam), the center of the top device hole connecting the column top and the truss shall be taken as the benchmark.


Then, the setting of center line sign shall conform to the following provisions: a center sign shall be set in the direction of the upper line on the surface of the column base plate, and a center sign shall be set on both sides of the line direction; A center line shall be set at the upper line and column line direction of the column body, and a center mark shall be set at the bottom, middle (bracket or shoulder beam) and top of each center line; The double bracket (shoulder beam) column is set with center marks on the outer surface of the two column shafts in the line direction.


2. During the construction of steel structure plant, the multi section column device shall be assembled into a whole and then hoisted.


3. The correction of steel column device shall comply with the following provisions: eliminate the deviation caused by side sunlight; The verticality deviation of the column shall be controlled according to the temperature (season). After the crane beam, roof truss device and crane beam are adjusted, fixed and connected, the steel column shall be retested, and those exceeding the allowable deviation shall be adjusted in time.


4. For columns with large slenderness ratio, temporary fixing measures shall be added after hoisting.


5. The installation of inter column support shall be carried out after the alignment of columns, and the inter column support shall be installed under the condition of ensuring the verticality of columns.


Quality is the life of construction projects. Quality is the first priority in the construction of steel structure workshops. Only quality is the first, can an enterprise have a long term. Only good process methods and correct and reasonable operation methods can ensure the high-quality completion of the project.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
工艺法兰| 波纹管补偿器| 气动衬氟蝶阀| 全温水浴恒温振荡器| PE一体化污水处理设备| 电杆荷载挠度测试仪| Whirl| 西门子电磁流量传感器| 便携式测振仪| 实验室水质分析仪器| 直流式高压鼓风机| 真空泵维修| 固相萃取仪| 武藏三轴点胶机| 经济型橡胶| 直流验电器| toss加热丝加热条| 罗姆分析仪| GPS网络时钟| 杭州测功机厂家| 水质在线溶解固体TDS分析仪| 加工中心护板| 免疫球蛋白G4Elisa试剂盒| 食品检测仪器设备厂家| 医用离心机| 水处理超滤设备| 氮化镓充电器生产厂家| 拉力试验机| 广东二代仿石环保透水砖| 高杆灯厂家| sbs改性沥青| 临沂核心价值观生产厂家| Y型气动三通换向球阀| SEKO隔膜计量泵| 企业电力微电网平台| UV法COD监测仪| 复合肥设备生产线| 单色测温仪| 肝纤试剂盒| 全自动反冲洗过滤器| 色谱仪自动进样器|