Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:1766

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市胜邦钢结构有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粤ICP备13078463号
撬装系统| 超声波风速风向仪| 婴儿床冲击试验机| 不锈钢焊接水箱| Z3040摇臂钻床| 恒温恒湿箱| 透析袋夹子| 中国工程机械工业协会| 玉米加工设备| 旋转RTO厂家| 压缩空气检测仪| DOSENCE加药泵| 环保用| 米顿罗| 沥青保温闸阀| 真空感应悬浮炉| 串联谐振耐压成套装置| 低温控温仪| 触摸屏式介质损耗测试仪| 垂直水平电磁式振动试验机| 磨床除尘器| 热重分析仪| 1P| 盖博试验设备| 杭州测功机厂家| 洁净间高效风口检漏仪| 乙炔气体报警器| 常州市国立试验设备研究所| 观光车电机| 纺织品光蓄热性测试仪(透气包装材料微生物屏障分等仪)| 透水系数试验装置| FIB专用探针| 防静电三辊闸| 土壤质量分析仪| 排污液下泵厂家| 梁山融悦二手设备经营部| 泰方电缆设备厂| 碱性硫酸亚铁试纸| 中国工程机械工业协会| 降霾抑尘车| 斗式提升机|